Ribbon-cutting for 1.5 MW Brunswick Landing Solar PV Installation

9 Jan 2018 - 09:00

Midcoast Regional Redevelopment Authority (MRRA) and Diversified Communications will be hosting a ribbon cutting ceremony Tuesday, January 9th at 9 a.m. at 15 Terminal Road, 2nd floor, in Brunswick to celebrate the commissioning of 1.5 Megawatts of solar energy. This system is designed to provide 13.3 percent of Brunswick Landing’s annual electric load from on-site renewable energy, and eliminate over 2,018,800 pounds of CO2 emissions annually.